| 1 |
The Engineering, Procurement, Construction and Commissioning of Two (2) Storage Tanks and Associated Works at Langkawi Bulk Depot |
1. Construction of 2 nos. of cone roof tank
2. Piping works
3. Demolition & disposal of four (4) Nos. storage tanks
4. Upgrade & modification of fire fighting system
5. Replace, supply & install 1 unit Marine Loading Arm
6. Blasting & painting
7. Civil & piling works |
Langkawi |
Petronas Dagangan Berhad |
Oct 2004 - Oct 2005 |
| 2 |
The Engineering, Procurement, Construction of Natural Gas Distribution System to Klang Stage 1/03 Package 1 & 2 Package 1:
150m NPS 2”, 200m NPS 4”, 750m NPS 6” and 550m PE Package 2:
150m NPS 4”, 3,300m NPS 6” and 750m PE |
1. Construction of gas pipeline
2. Station civil works |
Klang |
Gas Malaysia Sdn Bhd |
Nov 2004-
Feb 2005 |
| 3 |
V-2515 Overhaul Works, F-2001/2/3/4 and Other Associated Works for PDH TA |
1. External Cleaning
2. Erecting & Dismantling scaffolding
3. Assisting DOSH Inspection
4. Blinding & Deblinding works |
Gebeng, Kuantan |
MTBE Malaysia Sdn Bhd |
Apr 2004 -
May 2004 |
| 4 |
Provision of Onshore Pipeline Protection Work for Petronas Carigali Sdn Bhd - SKO Operations |
1. Construction of pipeline protection slab
2. Pipeline coating & ultrasonic testing
3. Construction of R.C box culvert
Lowering of Crude Oil Pipeline |
Miri |
Petronas Carigali Sdn Bhd |
Jan 2004 -
Aug 2004 |
| 5 |
MLNG Rejuvenation and MLNG/MLNG 2 Revamp (MRR) Project Mechanical Work for Module 2 |
1. Turnaround & revamp works
2. Equipment Erection
3. Piping works
4. Steel Structure
5. Civil foundation works |
Bintulu |
Malaysia LNG Sdn Bhd |
Nov 2003-
Aug 2005 |
| 6 |
Fabrication and Installation of Scrubber Tank for Incinerator Unit U-1403 and New Effluent Vent Stack for Incinerator Unit U-1403 |
1. Construction of scrubber tank & EVS
2. Erecting &dismantling scaffolding
3. Civil foundation works |
Gebeng, Kuantan |
MTBE Malaysia Sdn Bhd |
Oct 2003 -
Jan 2004 |
| 7 |
The Supply, Delivery and Installation of Acid Tank and Piping in GPP 4, Gas Processing Plant Complex A |
1. Fiber tank construction
2. Fiber piping works
3. Foundation civil works
Instrumentation works |
Kerteh |
Petronas Gas Bhd |
Oct 2003 -
Feb 2004 |
| 8 |
The Engineering, Procurement, Construction of Natural Gas Distribution System to:
i. Rivertex (M) Sdn Bhd (1,500m of NPS 4”)
ii. Bukit Kemuning FL/DL Phase 1 (100m PE)
iii. APL Healthcare (60m NPS 6”) |
1. Construction of gas pipeline
2. Station civil works |
Kluang, Johor
Shah Alam
Seremban |
Gas Malaysia Sdn Bhd |
Nov 2003-
Jan 2004
Nov 2003-
Dec 2003
Oct 2003 - Nov 2003 |
| 9 |
PEMSB 2003 Turnaround - Defect Works |
1. Repair of ground flare
2. Valve servicing
3. Piping works
4. Erecting & dismantling scaffoldings
5. Blasting & painting |
Kerteh |
Polyethylene (M) Sdn Bhd |
Jun 2003 |
| 10 |
The Procurement, Construction and Commissioning of Metering Station and Pipeline Works for Perlis Lateral Pipeline |
1. Design Works
2. Procurement Services
3. Pipeline Construction
4. Civil Works
5. Electrical & Instrumentation Works
6. Commissioning
7. Aboveground Station Piping |
Perlis |
Petronas Gas Berhad |
Feb 2002-
Jan 2003 |
| 11 |
The Engineering, Procurement, Construction & Commissioning of A New Product Delivery Centre (PDC) |
1. Design Works
2. Procurement Services
3. Piping works
4. Civil Works
5. Electrical & Instrumentation Works
6. Commissioning |
Miri Port, Sarawak |
Petronas Dagangan Berhad |
Jul 2002 - Jan 2003 |
| 12 |
Pressure Vessel Overhaul Works for MTBE Malaysia Sdn. Bhd |
1. Internal & External Cleaning
2. Painting & Blasting
3. Re-insulation Works
4. Servicing Works
5. Erection & Dismantling Scaffolding
6. Blinding & Deblinding Works
7. Assisting DOSH Inspection |
Gebeng, Kuantan |
MTBE Malaysia
Sdn. Bhd |
Jul 2002 -
Sept 2002 |
| 13 |
Provision For Equipment, Tools, Material, Transportation and Consumable For Removal And Installation/Commissioning of High Pressure Flash Drum (V6-0201) At Gas Processing Plant Complex B (GPP-B) |
1. Shutdown and Miscellaneous works
2. Heavy Lifting Insulation Works
3. Civil Works
4. Mechanical and Piping Works
5. E & I Works |
Kerteh |
Petronas Gas Berhad |
Jan 2002 -
Feb 2002 |
| 14 |
Shutdown and Marking Works for MTBE PDH |
1. Shutdown & Miscellaneous Hot Works
2. Painting Works |
Gebeng, Kuantan |
MTBE (Malaysia) Sdn Bhd |
Sept 2001
-
Oct 2001 |
| 15 |
The Construction, Testing and Commissioning of The Semi-Fixed Full Surface Fire Protection System For PSR-2, Crude Oil Tank. |
1. Mechanical and Piping Works
2. Civil Works
3. Blasting & Painting |
Melaka |
Petronas Penapisan Melaka
Sdn. Bhd. |
Sept 2001 -
Feb 2002 |
| 16 |
The Engineering, Procurement, Construction, Testing and Commissioning of Bitumen Storage Tanks and Related Facilities |
1. Tank Construction
2. Piping Works
3. E & I works
4. Steel Structure
5. Blasting & Painting
6. Design
7. Civil, building and piling works |
PDB Bulk Dept, Sepangar Bay Kota Kiinabalu |
Petronas Dagangan Berhad |
Jan 2001 -
June 2001 |
| 17 |
Co Combustor and Chamber Combustor for the FCC Flue Gas Furnace |
1. Fabricate 60 tonnes of steelworks
2. Blast, paint and galvanize steel surface
3. Transportation to Port Klang |
KQKS Nilai Workshop |
Mobil Australia/
Foster Wheeler |
Feb 2001 -
May 2001 |
| 18 |
Mechanical Erection of Static Equipment and Pipeline Installation Works for Dehydrogenation Project |
1. Installation of 120 nos. static equipment with a total weight of 3,000 tons
2. Construction of 2km 6in Butane, 2in Butane and 2in Hydrogen Pipelines |
Gebeng, Kuantan |
MTBE (Malaysia) Sdn Bhd |
June 1999
-
Apr 2000 |
| 19 |
LPG/LSWR Pipeline for Shell & Esso Refinery |
1. Pipeline construction
2. Civil works including piling
3. Electrical & instrumentation works
4. Blast and paint pipeline
5. Insulation
6. Testing & Commissioning |
Shell/Esso Refinery Port Dickson |
Shell Refining Co. (FOM) Bhd Esso Malaysia Bhd, PDR |
Aug 1998-
April 1999 |
| 20 |
Piping Erection Works for Titan No. 2 Cracker Project, Pasir Gudang |
1. Erection of 90,000 ID piping work in Process Plant
2. Fabricate & install 90 tons of pipe supports
3. NDT inspection
4. Hydrotesting
5. Precommissioning & commissioning |
Titan Petro-chemical, Pasir Gudang, Johor |
JGC Corporation |
Mar 1998 -
Feb 1999 |
| 21 |
Pressure Vessels Overhaul For Area A for MTBE 98 Turnaround |
1. Turnaround works |
MTBE Kuantan, Pahang |
MTBE Malaysia
Sdn Bhd |
July 1998-
July 1998 |
| 22 |
Outside Plant Piping Work for Air Separation Plant |
1. Pipeline Construction |
Banting, Selangor |
Messer Asia-Pacific Pte Ltd |
Dec 1997-
May 1998 |
| 23 |
Design, Supply, Fabrication, Installation, Testing And Commissioning For the Tankage Works & Additive Shed at LOBP |
1. Tank Construction
2. Piping Works
3. Civil Works
Electrical & Instrumentation works |
Shell Refinery, Port Dickson |
Shell Malaysia Trading Sdn Bhd |
Dec 1997 May 1998 |
| 24 |
Supply, Fabrication of CO Combustor, Super Structure and Ductings |
1. Fabricate 250 tonnes of steelworks
2. Blast, paint and galvanise steel surface
3. Transportation to site
Preparation of shop drawings |
KQKS Nilai Workshop |
Foster Wheeler/JGC |
Nov 1997-
Apr 1998 |
| 25 |
Supply and Mechanical Installation for Hysol Packaging Plant |
1. Mechanical, electrical & interior renovation |
Shah Alam, Selangor |
Dexter Electronics |
Dec 1997-
Apr 1998 |
| 26 |
Renovation Works Of PDB Service Station |
1. Civil Construction |
Pahang |
Petronas Dagangan Bhd |
Aug 1997-
Jan 1998 |
| 27 |
Construction of Guardhouse and Related Facilities For Proposed KVDT FMT |
1. Civil construction & building works |
Sepang, Selangor |
Shell Malaysia Trading Sdn Bhd |
Oct 1997 -
Jan 1998 |
| 28 |
Piping Work for LRCCU Crude & Bitumen Tank Farm |
1. Fabricate and erect 45,000 I.D piping
2. Civil works including pipe sleepers and road crossings
3. Fabricate and erect 11,000m of steam tracing
4. Fabricate and erect of 100 tons of steel structure
5. 27 process tie-ins and 10 firewater tie-ins
6. Demolish 50 tons of existing pipeline and structure
7. Blast and paint all piping
8. Insulation works
9. Equipment installation works |
Shell Refinery, Port Dickson |
Shell Refining Company (FOM) Bhd |
Nov 1996-
Sep 1997 |
| 29 |
Design, Procurement, Construction of New Warehouse Complete With Facilities, Pump Yard Shed, Modification of Main Office Building, upgrading of Driveway and Tank Farm Area |
1. Mechanical Construction
2. Civil Works
3. Electrical and Instrumentation Works |
Petronas Depot, Bintulu, Sarawak |
Petronas Dagangan Bhd |
Jan 1997 -
May 1997 |
| 30 |
Opening, Cleaining and Closing of Pressure Vessel For Equipment Inspection, Removal and Reinstatement of Control Valves and Safety Valves and Associated Work for Area A During PPMSB 2nd Turnaround |
1. Turnaround works |
Petronas Refinery, Melaka |
PPMSB |
Dec 1996 |
| 31 |
Supply of Manpower for Alignment of Pumps and Erection of Pnuematic Conveying System |
1. Mechanical Installation |
Amoco(M) Sdn Bhd, Kuantan |
Technip Far East Sdn Bhd |
Dec 1995-
May 1996 |
| 32 |
Design, Supply, Fabrication, Installation and Commissioning to Upgraded Fire-Fighting System at Shell Installation |
1. Mechanical, Electrical & Civil Construction |
Shell Installation, Pasir Gudang |
Shell Malaysia Trading Sdn Bhd |
Nov 1995-
Apr 1996 |
| 33 |
Furnace F-190 Stainless Steel Line Upgrading, Shell Refinery |
1. Modify and tie-in furnace manifold lines |
Shell Refinery |
Shell Refining Company (FOM) |
Nov 1995 |
| 34 |
Engineering, Procurement and Construction of One Floating Roof Tank(D-903) |
1. EPCC of one number 66m dia. floating roof tank |
Petronas Refinery, Kerteh |
PP(T)SB / Babcock Sdn Bhd |
Aug 1994-
Oct 1995 |
| 35 |
Design, Supply, Fabrication, Installation and Commissioning to Upgraded Fire-Fighting System at Shell Installation, Ipoh |
1. Mechanical, Electrical & Civil Construction |
Shell Depot, Ipoh |
Shell Malaysia Trading Sdn Bhd |
Jun 1995 -
Oct 1995 |
| 36 |
Heat Exchanger Bundle Pulling, Cleaning, Testing And Associated Works For Area A & B During PPMSB 1st Turnaround |
1. Turnaround works |
Petronas Refinery, Melaka |
PP(M)SB |
Jul 1995 |
| 37 |
Esso Refinery April 95 Tuarnaround - Flare Tip Replacement & Heat Exchanger Works |
1. Turnaround works |
ESSO Refinery, Port Dickson |
ESSO Malaysia Berhad |
Apr 1995 |
| 38 |
APS Modernization Project for Esso Malaysia Berhad Port Dickson |
1. Fabricate & erect 180 tons of steel structure
2. Fabricate & erect 65,000 ID piping works
3. Demolish 120 tons of process piping during Turnaround
4. 400 tie-ins |
ESSO Refinery, Port Dickson |
JGC Corporation |
Oct 1994 -
Apr 1995 |
| 39 |
Supply, Fabrication and Erection of Furnace F-456 for Shell Refinery |
1. Supply, fabrication and erection of furnace
2. Ducting tie-in during shutdown |
Shell Refinery, Port Dickson |
Foster Wheeler Energy Ltd. |
Sep 1993-
May 1994 |
| 40 |
Refinery Complex 2 Shutdown, March/April 94 Heat Exchanger and Air Coolers Maintenance |
1. Turnaround works |
Shell Refinery, Port Dickson |
Shell Refining Company (FOM) Bhd |
Apr 1994 |
| 41 |
D & E, Fabrication, Erection and Associated Works For One Cone Roof Tank (T 1583) - Dia 24.4M x 21.95M HT |
1. EPCC of cone roof tank |
Shell Refinery, Port Dickson |
Shell Refining Company (FOM) Bhd |
Feb 1993 -
Apr 1994 |
| 42 |
Construction & Commissioning of Jet Fuel Hydrant Line at Terminal 3 Subang Airport |
1. Pipeline Construction |
Subang Airport |
Petronas Dagangan Bhd |
Feb 1993 Jul 1993 |
| 43 |
Upgrading of Firewater System at Bagan Luar Depot, Prai |
1. Mechanical, Electrical & Civil Construction |
Shell Installation, Prai |
Shell Malaysia Trading Sdn Bhd |
Dec 1992-
May 1993 |
| 44 |
Complex 1 Feb. 93 Shutdown - Heat Exchangers and Furnace Maintenance Work |
1. Turnaround works |
Shell Refinery, Port Dickson |
Shell Refining Company (FOM) Bhd |
Feb 1993 |
| 45 |
Complex 2 Aug.92 Shutdown Heat Exchangers and Furnace Maintenance Work |
1. Turnaround works |
Shell Refinery, Port Dickson |
Shell Refining Company (FOM) Bhd |
Aug 1992 |
| 46 |
Esso Refinery April 92 Turnaround - Heat Exchangers, Air Coolers, Vessels and Column T1B Wall Lining |
1. Turnaround works |
ESSO Refinery, Port Dickson |
ESSO Malaysia Berhad |
May 1992 |
| 47 |
Supply and Installation of 12" dia. Tie-ins From Crude Feeders to Tank D-941 at PPTSB Refinery, Kerteh |
1. Fabricate and install crude pipeline
2. Hot tapping and tie-in
3. Blast and paint piping |
Petronas Refinery, Kerteh |
Petronas Penapisan (T) Sdn Bhd |
Oct 1991 - Dec 1991 |
| 48 |
Storage Tanks (T-2060/63) Demolition and Re-Erection at Shell Refinery |
1. Tank Construction |
Shell Refinery, Port Dickson |
Shell Refining Company (FOM) Bhd |
Sep 1991-
Dec 1991 |
| 49 |
Cleaning, Repair, Surface Preparation and Painting Works on Floating Roof Tanks D-911 and D-921 |
1. Tank Maintenance
2. Blast and repaint the tanks |
Petronas Refinery, Kerteh |
Petronas Penapisan (T) Sdn Bhd |
Aug 1991- Dec 1991 |
| 50 |
Piping Works for Polypropylene Plant, Its Utilities and Offsite Facilities at Kuantan, Pahang |
1. Fabricate & erect onsite & offsite piping work (80,000 ID
2. carbon steel & 20,000 ID stainless steel pipe)
3. Fabricate and install 80 tons of pipe supports
Assist in commissioning and start-up |
Poly-propylene Malaysia Kuantan |
Toyo Engineering Corporation |
Jun 1991 -
May 1992 |
| 51 |
Complex 1 April 91 Shutdown - Heat Exchangers Maintenance |
1. Turnaround works |
Shell Refinery |
Shell Refining Company (FOM) |
Apr 1991 |
| 52 |
Dismantle, Repair and Re-erect High Level Flare Stack at PP(T)SB |
1. Maintenance Services |
Pertronas Refinery |
Petronas Penapisan (T) Sdn Bhd |
June 1990 |
| 53 |
Mechanical Piping Works for PDR No. 2 Powerformer Project |
1. Fabricate & erection of 60,000 ID of process piping
2. NDT works
3. 8 tie-ins during turnaround |
Esso Refinery, Port Dickson |
JGC Corporation |
Jun 1989 -
Dec 1989 |
| 54 |
Shell Refinery 1986/1987 Expansion & Construction Project- ABS, BBU, MVU & HVU Units |
1. Fabrication & erection of piperacks along Road 4 & 5
2. Steel structure Part 5A in ABS, MVU, BBU, HVU & along Road 7
3. Part 10/7A - Piping, fabrication, installation & erection of major equipment - 88,000 ID
Part 6B - erection of CCR steel structure & major equipment |
Shell Refinery, Port Dickson |
Shell Refining Company (FOM) Bhd |
Feb 1987 Dec 1987 |
| 55 |
Construction of Platform II Complex Project |
1. Fabrication, installation & erection of steel structure, platform, railings & gratings - 1,000 tons
2. Prefabrication & erection of in-plot piping - 87,000 ID
3. Fabrication & erection of 6 units of gas-fired heaters 650 tons Hiring of cranes, transportation & erection of heavy equipment - 840 tons |
Shell Refinery, Port Dickson |
Shell Refining Company (FOM) Bhd |
Jan 1982 - Dec 1982 |